Snells Beach Substation

IMG_5224.JPG

Client
Vector

Sector
Power

This project was to install Tesla Batteries into the Snells Beach Substation to increase the power supply available to the area. J&R Contracting were awarded the Project as Main Contractor to work alongside Electrix to install the system. We started with an access road, major excavation installing the power duct by trenching and HDD drilling, concrete pads for the batteries, concrete block walls for the switchgear containers, transformer and RMU pads followed by a 4m high acoustic wall, site fencing, gates and a driveway.